Mpumalanga Mesh:Picture Gallery: Difference between revisions

From Fmfi
(3 May 2005 - Sikele installation)
 
Line 33: Line 33:


<gallery>
<gallery>
Image:Sikele_mounting1.jpg
Image:Sikele_mounting1.jpg|Beginning the installation of the mounting bracket
Image:Sikele_mounting2.jpg
Image:Sikele_mounting2.jpg|Drilling mounting points
Image:Sikele_mounting3.jpg
Image:Sikele_mounting3.jpg|Bolting on bracket
Image:Sikele_mast_preperation1.jpg
Image:Sikele_mast_preperation1.jpg|Fastening omni bracket to top of mast
Image:Sikele_mast_preperation2.jpg
Image:Sikele_mast_preperation2.jpg|Attaching the Linksys outdoor housing
Image:Sikele_mast_up.jpg
Image:Sikele_mast_up.jpg|Attaching mast to bracket
Image:Sikele_power_over_ethernet.jpg
Image:Sikele_power_over_ethernet.jpg|Connecting the power of ethernet
</gallery>
</gallery>


==29 April 2005 - walkabout==
==29 April 2005 - walkabout==

Latest revision as of 17:10, 28 October 2007

Project Overview    Team and Contact    Technology    Progress    Stories    Dissemination    Picture Gallery    Project Chapter


01 - 02 July 2007: LinkNet from Macha, Zambia visit to Peebles Valley

13 October 2006: Visit

26 May 2006: Visit

05-06 July 2005: Visit and APTN film crew visit

3 May - Sikele installation

29 April 2005 - walkabout

These are various pictures taken on a drive-about to inspect various highsites and get signal readings from the clinic.

Ideal highsite

We identified an ideal highsite, the owner worked in Johannesburg and was not at all interested in us mounting an antenna on his roof. The house itself sat exactly on the ridge and could see the clinic as well as the hospice.

Teachers' training centre

The teachers' training centre would have been ideal but due to problems with equipment we never used this site. Know that we use OLSR this could probably be easily connected.

ACTS clinic flats

Last stop the clinic flats where we eventually installed a node.