Mpumalanga Mesh:Picture Gallery: Difference between revisions

From Fmfi
 
(3 intermediate revisions by the same user not shown)
Line 28: Line 28:
Image:APTN_film crew.jpg|APTN film crew
Image:APTN_film crew.jpg|APTN film crew
Image:Dwayne_Lassy_David.jpg|Dwayne, Lassy and David
Image:Dwayne_Lassy_David.jpg|Dwayne, Lassy and David
</gallery>
==3 May - Sikele installation==
<gallery>
Image:Sikele_mounting1.jpg|Beginning the installation of the mounting bracket
Image:Sikele_mounting2.jpg|Drilling mounting points
Image:Sikele_mounting3.jpg|Bolting on bracket
Image:Sikele_mast_preperation1.jpg|Fastening omni bracket to top of mast
Image:Sikele_mast_preperation2.jpg|Attaching the Linksys outdoor housing
Image:Sikele_mast_up.jpg|Attaching mast to bracket
Image:Sikele_power_over_ethernet.jpg|Connecting the power of ethernet
</gallery>
</gallery>


Line 38: Line 50:
</gallery>
</gallery>


===Ideal highsite===
We identified an ideal highsite, the owner worked in Johannesburg and was not at all interested in us mounting an antenna on his roof.  The house itself sat exactly on the ridge and could see the clinic as well as the hospice.
We identified an ideal highsite, the owner worked in Johannesburg and was not at all interested in us mounting an antenna on his roof.  The house itself sat exactly on the ridge and could see the clinic as well as the hospice.


Line 45: Line 58:
Image:View_ideal_highsite3.jpg|Looking across the road towards the hospice
Image:View_ideal_highsite3.jpg|Looking across the road towards the hospice
Image:Ideal_highsite.jpg|A view of the house, we would have mounted the antenna on the leftmost part of the building
Image:Ideal_highsite.jpg|A view of the house, we would have mounted the antenna on the leftmost part of the building
</gallery>
===Teachers' training centre===
The teachers' training centre would have been ideal but due to problems with equipment we never used this site.  Know that we use OLSR this could probably be easily connected.
<gallery>
Image:Teachers_training_centre.jpg|Lassy outside Hazyview teachers centre, holding omni for signal testing
Image:View_teachers_training_centre.jpg|Looking back towards the clinic, Legogote mountain to the left is very close to the clinic
Image:Supervisor_teachers_training_centre1.jpg|The teachers centre supervisor
Image:Supervisor_teachers_training_centre2.jpg|Supervisor on the steps of the Hazyview teachers centre
</gallery>
===ACTS clinic flats===
Last stop the clinic flats where we eventually installed a node.
<gallery>
Image:ACTS_flats.jpg|Looking up at the clinic flats from the clinic
</gallery>
</gallery>

Latest revision as of 17:10, 28 October 2007

Project Overview    Team and Contact    Technology    Progress    Stories    Dissemination    Picture Gallery    Project Chapter


01 - 02 July 2007: LinkNet from Macha, Zambia visit to Peebles Valley

13 October 2006: Visit

26 May 2006: Visit

05-06 July 2005: Visit and APTN film crew visit

3 May - Sikele installation

29 April 2005 - walkabout

These are various pictures taken on a drive-about to inspect various highsites and get signal readings from the clinic.

Ideal highsite

We identified an ideal highsite, the owner worked in Johannesburg and was not at all interested in us mounting an antenna on his roof. The house itself sat exactly on the ridge and could see the clinic as well as the hospice.

Teachers' training centre

The teachers' training centre would have been ideal but due to problems with equipment we never used this site. Know that we use OLSR this could probably be easily connected.

ACTS clinic flats

Last stop the clinic flats where we eventually installed a node.